As part of the Metro North Railway Order application process, Railway Procurement Agency (RPA) placed the Metro North Railway Order application documents on display in An Bord Pleanála’s offices and elsewhere on the 17th of September 2008 as set out in the Metro North Railway Order application Newspaper Notice published on the 9th, 10th and 12th of September 2008, available to view below. If granted this Railway Order will provide RPA with the powers necessary to construct, operate and maintain a metro line between Belinstown in North County Dublin and St. Stephen’s Green in Dublin City Centre.


Further Information Request
On 29th June 2009, RPA received correspondence from An Bord Pleanála regarding further information required. Click here to view or download this letter.


The "Further Information" requested on 26th June 2009 and the "Scheme Traffic Management Plan" (STMP), submitted at the oral hearing has been placed on this website at the request of An Bord Pleanála.


Letter from An Bord Pleanála 13th October 2009
On 13th October 2009, RPA received correspondence from An Bord Pleanála regarding further information requested.

Please note this website has been updated as of 11 November 2009 to include part of a report relating to Item 15(g) of the further information request which was omitted from RPA’s submission to the Board of 1 October 2009

Item 15(g) requested the following information:

Item 15(g) “Submit details of the available data on the baseline noise levels and construction noise levels and their impacts, at the Mater Hospital (MMUH) and as referred to by Mr Rupert Taylor in evidence to the Oral Hearing. In addition, submit similar details for the Mater Private Hospital, the Rotunda Hospital, Temple St. Hospital, Hampstead Private Hospital and Elmhurst Convalescent Home.”

The omitted document entitled Item 15 (g) Elmhurst Construction Noise Assessment Report relates to construction noise at Elmhurst Convalescent Home.

This document has been furnished to An Bord Pleanála and all relevant persons pursuant to section 40 (1) of the Transport (Railway Infrastructure) Act, 2001, as amended.


  • Item 15G Elmhurst Construction Noise Assessment report.pdf(0.32MB)

  • An Bord Pleanála Request 18th December 2009
    On Friday 18th December 2009, RPA put on public display the series of documents below as requested by An Bord Pleanála.

    Metro North Oral Hearing Further Information Requested by An Bord Pleanála

    Item 1
  • Item 1 Part 1 Fitzwilliam Hotel Part 1.pdf(2.8MB)
  • Item 1 Part 1 Fitzwilliam Hotel Part 2.pdf(2.3MB)
  • Item 1 Part 1 Fitzwilliam Hotel Part 3.pdf(2.9MB)
  • Item 1 Part 1 Fitzwilliam Hotel Part 4.pdf(2.8MB)
  • Item 1 Part 1 Fitzwilliam Hotel Part 5.pdf(2.9MB)
  • Item 1 Part 1 Fitzwilliam Hotel Part 6.pdf(2.2MB)
  • Item 1 Part 1 Fitzwilliam Hotel Part 7.pdf(2.3MB)
  • Item 1 Part 1 Fitzwilliam Hotel Part 8.pdf(2.4MB)
  • Item 1 Part 1 Fitzwilliam Hotel Appendix A Part 1.pdf(2.5MB)
  • Item 1 Part 1 Fitzwilliam Hotel Appendix A Part 2.pdf(2.7MB)
  • Item 1 Part 1 Fitzwilliam Hotel Appendix B.pdf(2.4MB)
  • Item 1 Part 2 Rotunda Hospital Part 1 of 7.pdf(2.9MB)
  • Item 1 Part 2 Rotunda Hospital Part 2 of 7.pdf(2.9MB)
  • Item 1 Part 2 Rotunda Hospital Part 3 of 7.pdf(2.9MB)
  • Item 1 Part 2 Rotunda Hospital Part 4 of 7.pdf(2.9MB)
  • Item 1 Part 2 Rotunda Hospital Part 5 of 7.pdf(2.9MB)
  • Item 1 Part 2 Rotunda Hospital Part 6 of 7.pdf(2.7MB)
  • Item 1 Part 2 Rotunda Hospital Part 7 of 7.pdf(1.7MB)
  • Item 1 Part 2 Appendix A Part 1 of 2.pdf(2.8MB)
  • Item 1 Part 2 Appendix A Part 2 of 2.pdf(1.9MB)
  • Item 1 Part 2 Appendix B.pdf(0.7MB)
  • Item 1 Part 2 Appendix C.pdf(0.3MB)
  • Item 1 Part 2 Appendix D.pdf(0.2MB)
  • Item 1 Part 2 Appendix E.pdf(2.7MB)
  • Item 1 Part 3 Mater Private Hospital_Main Report.pdf(2.9MB)
  • Item 1 Part 3 Appendix A Part 1 of 2.pdf(2.7MB)
  • Item 1 Part 3 Appendix A Part 2 of 2.pdf(1.9MB)
  • Item 1 Part 3 Appendix B Part 1 of 9.pdf(2.6MB)
  • Item 1 Part 3 Appendix B Part 2 of 9.pdf(2.9MB)
  • Item 1 Part 3 Appendix B Part 3 of 9.pdf(2.5MB)
  • Item 1 Part 3 Appendix B Part 4 of 9.pdf(1.1MB)
  • Item 1 Part 3 Appendix B Part 5 of 9.pdf(1.9MB)
  • Item 1 Part 3 Appendix B Part 6 of 9.pdf(2.6MB)
  • Item 1 Part 3 Appendix B Part 7 of 9.pdf(2.8MB)
  • Item 1 Part 3 Appendix B Part 8 of 9.pdf(2.5MB)
  • Item 1 Part 3 Appendix B Part 9 of 9.pdf(2.1MB)
  • Item 1 Part 3 Appendix C Part 1 of 2.pdf(3.1MB)
  • Item 1 Part 3 Appendix C Part 2 of 2.pdf(2.9MB)
  • Item 1 Part 3 Appendix D Part 1 of 4.pdf(2.4MB)
  • Item 1 Part 3 Appendix D Part 2 of 4.pdf(1.6MB)
  • Item 1 Part 3 Appendix D Part 3 of 4.pdf(2.6MB)
  • Item 1 Part 3 Appendix D Part 4 of 4.pdf(1.5MB)
  • Item 1 Part 3 Appendix E Part 1 of 3.pdf(2.9MB)
  • Item 1 Part 3 Appendix E Part 2 of 3.pdf(2.9MB)
  • Item 1 Part 3 Appendix E Part 3 of 3.pdf(1.2MB)
  • Item 1 Part 3 Appendix F.pdf(1.6MB)
  • Item 1 Part 4 St Joseph's Ave.pdf(2.3MB)
  • Item 1 Part 5 No 71 Ferguson Rd.pdf(2.2MB)
  • Item 1 Part 6 Corpus Christi.pdf(1.9MB)
  • Item 1 Part 7 No 2 Albert College Lawn.pdf(2.1MB)
  • Item 1 Part 8 Ceim Dearg Part 1 of 6.pdf(2.9MB)
  • Item 1 Part 8 Ceim Dearg Part 2 of 6.pdf(2.3MB)
  • Item 1 Part 8 Ceim Dearg Part 3 of 6.pdf(2.5MB)
  • Item 1 Part 8 Ceim Dearg Part 4 of 6.pdf(2.9MB)
  • Item 1 Part 8 Ceim Dearg Part 5 of 6.pdf(2.8MB)
  • Item 1 Part 8 Ceim Dearg Part 6 of 6.pdf(3.1MB)
  • Item 1 Part 8 Ceim Dearg Appendix A Part 1 of 2.pdf(2.7MB)
  • Item 1 Part 8 Ceim Dearg Appendix A Part 2 of 2.pdf(1.6MB)
  • Item 1 Part 9 Batter Lane.pdf(2MB)

  • Item 2
  • Item 2 Utilities Part 1 of 4.pdf(2.9MB)
  • Item 2 Utilities Part 2 of 4.pdf(2.8MB)
  • Item 2 Utilities Part 3 of 4.pdf(2.1MB)
  • Item 2 Utilities Part 4 of 4.pdf(1.9MB)
  • Item 2 Appendix A Risk Register.pdf(1.2MB)
  • Item 2 Appendix B Ballymun Drawings Part 1.pdf(3.9MB)
  • Item 2 Appendix B Ballymun Drawings Part 2.pdf(2.9MB)
  • Item 2 Appendix B Ballymun Drawings Part 3.pdf(1.2MB)
  • Item 2 Appendix B OCB Drawings.pdf(2.8MB)
  • Item 2 Appendix B Parnell Sq Drawings.pdf(2.1MB)
  • Item 2 Appendix B SSG Drawings.pdf(2.2MB)
  • Item 2 Appendix C Drawings Part 1.pdf(2.2MB)
  • Item 2 Appendix C Drawings Part 2.pdf(0.6MB)
  • Item 2 Appendix C Drawings Part 3.pdf(2.2MB)
  • Item 2 Appendix C Drawings Part 4.pdf(1.7MB)
  • Item 2 Appendix C Drawings Part 5.pdf(1.2MB)
  • Item 2 Appendix C Drawings Part 6.pdf(2.8MB)
  • Item 2 Appendix C Drawings Part 7.pdf(0.9MB)
  • Item 2 Appendix C Drawings Part 8.pdf(2.3MB)
  • Item 2 Appendix C Drawings Part 9.pdf(1.9MB)
  • Item 2 Appendix C Drawings Part 10.pdf(1.8MB)
  • Item 2 Appendix C Drawings Part 11.pdf(2.6MB)
  • Item 2 Appendix C Drawings Part 12.pdf(1.8MB)
  • Item 2 Appendix C Drawings Part 13.pdf(2.9MB)
  • Item 2 Appendix C Drawings Part 14.pdf(2.3MB)
  • Item 2 Appendix C Drawings Part 15.pdf(2.9MB)
  • Item 2 Appendix C Drawings Part 16.pdf(2.3MB)
  • Item 2 Appendix C Drawings Part 17.pdf(2.8MB)
  • Item 2 Appendix C Drawings Part 18.pdf(2.5MB)
  • Item 2 Appendix C Drawings Part 19.pdf(1.7MB)
  • Item 2 Appendix C Drawings Part 20.pdf(1.6MB)
  • Item 2 Appendix C Drawings Part 21.pdf(2.4MB)
  • Item 2 Appendix C Drawings Part 22.pdf(2.7MB)
  • Item 2 Appendix C Drawings Part 23.pdf(2.9MB)
  • Item 2 Appendix C Drawings Part 24.pdf(1.7MB)
  • Item 2 Appendix C Drawings Part 25.pdf(1.4MB)
  • Item 2 Appendix C Drawings Part 26.pdf(0.9MB)
  • Item 2 Appendix C Drawings Part 27.pdf(0.5MB)
  • Item 2 Appendix C Drawings Part 28.pdf(0.8MB)
  • Item 2 Appendix C Drawings Part 29.pdf(1.7MB)
  • Item 2 Appendix C Drawings Part 30.pdf(2.9MB)
  • Item 2 Appendix C Drawings Part 31.pdf(2.5MB)
  • Item 2 Appendix C Drawings Part 32.pdf(1.2MB)
  • Item 2 Appendix C Drawings Part 33.pdf(1.4MB)
  • Item 2 Appendix C Drawings Part 34.pdf(2.1MB)
  • Item 2 Appendix C Drawings Part 35.pdf(2.2MB)
  • Item 2 Appendix C Drawings Part 36.pdf(2.2MB)
  • Item 2 Appendix C Drawings Part 37.pdf(2.6MB)
  • Item 2 Appendix C Drawings Part 38.pdf(2.4MB)
  • Item 2 Appendix C Drawings Part 39.pdf(1.3MB)
  • Item 2 Appendix C Drawings Part 40.pdf(2.1MB)
  • Item 2 Appendix C Drawings Part 41.pdf(1.8MB)
  • Item 2 Appendix C Drawings Part 42.pdf(2.3MB)
  • Item 2 Appendix C Drawings Part 43.pdf(1.4MB)
  • Item 2 Appendix D Schedule of Utilities.pdf(1.7MB)

  • Item 3
  • Item 3 (a), (b) and (c) Archaeology & Architectural Heritage.pdf(1.1MB)
  • Item 3 Appendix A Part 1.pdf(2.3MB)
  • Item 3 Appendix A Part 2.pdf(2.5MB)
  • Item 3 Appendix A Part 3.pdf(2.9MB)
  • Item 3 Appendix A Part 4.pdf(2.4MB)
  • Item 3 Appendix A Part 5.pdf(2.2MB)
  • Item 3 Appendix A Part 6.pdf(2.3MB)
  • Item 3 Appendix A Part 7.pdf(2.9MB)
  • Item 3 Appendix A Part 8.pdf(2.9MB)
  • Item 3 Appendix A Part 9.pdf(1.9MB)
  • Item 3 Appendix A Part 10.pdf(2.6MB)
  • Item 3 Appendix A Part 11.pdf(2.2MB)
  • Item 3 Appendix A Part 12.pdf(2.6MB)
  • Item 3 Appendix A Part 13.pdf(2.6MB)
  • Item 3 Appendix A Part 14.pdf(2.1MB)
  • Item 3 Appendix A Part 15.pdf(2.8MB)
  • Item 3 Appendix A Part 16.pdf(2.2MB)
  • Item 3 Appendix A Part 17.pdf(2.6MB)
  • Item 3 Appendix A Part 18.pdf(2.7MB)
  • Item 3 Appendix A Part 19.pdf(2.3MB)
  • Item 3 Appendix A Part 20.pdf(2.6MB)
  • Item 3 Appendix A Part 21.pdf(2.7MB)
  • Item 3 Appendix A Part 22.pdf(2.8MB)
  • Item 3 Appendix A Part 23.pdf(2.9MB)
  • Item 3 Appendix A Part 24.pdf(2.6MB)
  • Item 3 Appendix A Part 25.pdf(2.6MB)
  • Item 3 Appendix A Part 26.pdf(2.9MB)
  • Item 3 Appendix B Part 1.pdf(2.8MB)
  • Item 3 Appendix B Part 2.pdf(2.6MB)
  • Item 3 Appendix B Part 3.pdf(2.6MB)
  • Item 3 Appendix B Part 4.pdf(2.9MB)
  • Item 3 Appendix C.pdf(2.9MB)
  • Item 3 Appendix D Part 1.pdf(2.9MB)
  • Item 3 Appendix D Part 2.pdf(2.7MB)
  • Item 3 Appendix D Part 3.pdf(2.9MB)
  • Item 3 Appendix D Part 4.pdf(2.9MB)
  • Item 3 Appendix D Part 5.pdf(1.6MB)
  • Item 3 Appendix E Part 1.pdf(3.8MB)
  • Item 3 Appendix E Part 2.pdf(3MB)
  • Item 3 Appendix E Part 3.pdf(2.2MB)
  • Item 3 Appendix E Part 4.pdf(3.6MB)
  • Item 3 Appendix E Part 5.pdf(3.2MB)
  • Item 3 Appendix E Part 6.pdf(2.1MB)
  • Item 3 Appendix E Part 7.pdf(2.4MB)
  • Item 3 Appendix F Part 1.pdf(3.6MB)
  • Item 3 Appendix F Part 2.pdf(3MB)
  • Item 3 Appendix F Part 3.pdf(3.4MB)
  • Item 3 Appendix F Part 4.pdf(3.1MB)
  • Item 3 Appendix F Part 5.pdf(1.9MB)
  • Item 3 Appendix F Part 6.pdf(2.6MB)
  • Item 3 Appendix F Part 7.pdf(2.7MB)
  • Item 3 Appendix G.pdf(0.3MB)
  • Item 3 (d) Appendix H Architectural Scheme Concept Report Part 1.pdf(3.25MB)
  • Item 3 (d) Appendix H Architectural Scheme Concept Report Part 2.pdf(2.28MB)
  • Item 3 (d) Appendix H Architectural Scheme Concept Report Part 3.pdf(2.88MB)
  • Item 3 (d) Appendix H Architectural Scheme Concept Report Part 4.pdf(3.46MB)
  • Item 3 (d) Appendix H Architectural Scheme Concept Report Part 5.pdf(2.45MB)
  • Item 3 (d) Appendix H Architectural Scheme Concept Report Part 6.pdf(2.32MB)
  • Item 3 (d) Appendix H Architectural Scheme Concept Report Part 7.pdf(2.54MB)
  • Item 3 (d) Appendix H Architectural Scheme Concept Report Part 8.pdf(2.01MB)
  • Item 3 (d) Appendix H Architectural Scheme Concept Report Part 9.pdf(2.92MB)
  • Item 3 (d) Appendix H Architectural Scheme Concept Report Part 10.pdf(3.07MB)
  • Item 3 (d) Appendix H Architectural Scheme Concept Report Part 11.pdf(3.39MB)
  • Item 3 (d) Appendix H Architectural Scheme Concept Report Part 12.pdf(2.56MB)
  • Item 3 (d) Appendix H Architectural Scheme Concept Report Part 13.pdf(2.05MB)
  • Item 3 (d) Appendix H Architectural Scheme Concept Report Part 14.pdf(1.66MB)
  • Item 3 (d) Appendix H Architectural Scheme Concept Report Part 15.pdf(2.59MB)
  • Item 3 (d) Appendix H Architectural Scheme Concept Report Part 16.pdf(2.86MB)
  • Item 3 (d) Appendix H Architectural Scheme Concept Report Part 17.pdf(2.75MB)
  • Item 3 (d) Appendix H Architectural Scheme Concept Report Part 18.pdf(2.65MB)
  • Item 3 (d) Appendix H Architectural Scheme Concept Report Part 19.pdf(2.54MB)
  • Item 3 (d) Appendix H Architectural Scheme Concept Report Part 20.pdf(2.65MB)
  • Item 3 (d) Appendix H Architectural Scheme Concept Report Part 21.pdf(2.48MB)
  • Item 3 (d) Appendix H Architectural Scheme Concept Report Part 22.pdf(2.25MB)
  • Item 3 (d) Appendix H Architectural Scheme Concept Report Part 23.pdf(2.40MB)
  • Item 3 (d) Appendix H Architectural Scheme Concept Report Part 24.pdf(2.48MB)
  • Item 3 (d) Appendix H Architectural Scheme Concept Report Part 25.pdf(2.61MB)
  • Item 3 (d) Appendix H Architectural Scheme Concept Report Part 26.pdf(2.32MB)
  • Item 3 (d) Appendix H Architectural Scheme Concept Report Part 27.pdf(2.43MB)
  • Item 3 (d) Appendix H Architectural Scheme Concept Report Part 28.pdf(3.87MB)
  • Item 3 (d) Appendix I Metro North Architectural Design Guide.pdf(2.59MB)

  • Item 4
  • Item 4 Flood Risk Assessment.pdf(1.3MB)
  • Item 4 Appendix A.pdf(0.2MB)
  • Item 4 Appendix B.pdf(0.4MB)
  • Item 4 Appendix C Drawing 1.pdf(4.6MB)
  • Item 4 Appendix C Drawing 2.pdf(1.3MB)
  • Item 4 Appendix C Drawing 3.pdf(1.4MB)

  • Item 5
  • Item 5 Provisional Stops.pdf(2.7MB)

  • Item 6
  • Item 6 Park & Ride Sites.pdf(1.3MB)

  • Item 7
  • Item 7 Impact of Elevated Track.pdf(1.4MB)
  • Item 7 Appendix A Pinnock Hill Photomontage.gif(3.4MB)
  • Item 7 Appendix B Drawings.pdf(2.3MB)

  • Item 8
  • Item 8 Alignment Option through Ballymun Part 1.pdf(3.8MB)
  • Item 8 Alignment Option through Ballymun Part 2.pdf(3.5MB)
  • Item 8 Alignment Option through Ballymun Part 3.pdf(2.5MB)
  • Item 8 Alignment Option through Ballymun Part 4.pdf(2.2MB)

  • Item 9
  • Item 9 DCU Stop Part 1.pdf(3.8MB)
  • Item 9 DCU Stop Part 2.pdf(3.8MB)
  • Item 9 DCU Stop Part 3.pdf(3.6MB)
  • Item 9 DCU Stop Part 4.pdf(3.6MB)
  • Item 9 DCU Stop Part 5.pdf(3.7MB)
  • Item 9 DCU Stop Part 6.pdf(1MB)

  • Item 10
  • Item 10 Tunnel Launch at Albert College Park.pdf(2.4MB)

  • Item 11
  • Item 11 Treatment of Spoil.pdf(1.6MB)

  • Item 12
  • Item 12 Electromagnetic Interference.pdf(1.3MB)
  • Item 12 Appendix A Drawings.pdf(2.2MB)
  • Item 12 Appendix B Drawings Part 1.pdf(3.5MB)
  • Item 12 Appendix B Drawings Part 2.pdf(2.8MB)
  • Item 12 Appendix C.pdf(0.6MB)
  • Item 12 Appendix D.pdf(0.1MB)
  • Item 12 Appendix E.pdf(0.3MB)

  • Item 13
  • Item 13 Construction Traffic Impacts.pdf(1.3MB)

  • Item 14
  • Item 14 Dust.pdf(2.4MB)

  • Item 15
  • Item 15 Airborne Noise Part 1.pdf(3.8MB)
  • Item 15 Airborne Noise Part 2.pdf(1.4MB)

  • Item 16
  • Item 16 (a) and (c) Assessment of Environmental Risks.pdf(2MB)
  • Item 16 (b) Assessment of Environmental Risks.pdf(1.4MB)

  • Item 17
  • Item 17 Geotechnical and Geological Risks.pdf(1.3MB)
  • Item 17 Appendix A.pdf(0.1MB)
  • Item 17 Appendix B.pdf(3.5MB)

  • Item 18
  • Item 18 Vibrations and Groundborne Noise.pdf(1MB)
  • Item 18 Appendix A Drawing 1.pdf(2MB)
  • Item 18 Appendix A Drawing 2.pdf(2.3MB)
  • Item 18 Appendix A Drawing 3.pdf(3.3MB)
  • Item 18 Appendix A Drawing 4.pdf(3.8MB)
  • Item 18 Appendix A Drawing 5.pdf(3.8MB)
  • Item 18 Appendix A Drawing 6.pdf(3.9MB)
  • Item 18 Appendix A Drawing 7.pdf(3.5MB)
  • Item 18 Appendix A Drawing 8.pdf(3.6MB)
  • Item 18 Appendix B Drawing 1.pdf(2.4MB)
  • Item 18 Appendix B Drawing 2.pdf(2.6MB)
  • Item 18 Appendix B Drawing 3.pdf(2.8MB)
  • Item 18 Appendix B Drawing 4.pdf(3.1MB)
  • Item 18 Appendix B Drawing 5.pdf(3.2MB)
  • Item 18 Appendix B Drawing 6.pdf(3.4MB)
  • Item 18 Appendix B Drawing 7.pdf(3.6MB)
  • Item 18 Appendix B Drawing 8.pdf(3.5MB)
  • Item 18 Appendix B Drawing 9.pdf(3.3MB)
  • Item 18 Appendix B Drawing 10.pdf(3.4MB)
  • Item 18 Appendix C Drawing 1.pdf(2.4MB)
  • Item 18 Appendix C Drawing 2.pdf(2.2MB)
  • Item 18 Appendix C Drawing 3.pdf(2.7MB)
  • Item 18 Appendix C Drawing 4.pdf(3.1MB)
  • Item 18 Appendix C Drawing 5.pdf(3.2MB)
  • Item 18 Appendix C Drawing 6.pdf(3.4MB)
  • Item 18 Appendix C Drawing 7.pdf(3.6MB)
  • Item 18 Appendix C Drawing 8.pdf(3.7MB)
  • Item 18 Appendix C Drawing 9.pdf(3.3MB)
  • Item 18 Appendix C Drawing 10.pdf(3.5MB)
  • Item 18 Appendix D.pdf(3.4MB)
  • Item 18 Appendix E.pdf(1MB)
  • Item 18 Appendix F.pdf(0.2MB)
  • Item 18 Appendix G.pdf(0.6MB)

  • Item 19
  • Item 19 Groundwater and Geohydrology.pdf(2.2MB)

  • Metro North Railway Order Further Information Request Newspaper Notice
    Purchase of Documents

    The further information submitted may be inspected free of charge or purchased on payment of €5 for CDs, €30 each for items 1, 2, 3, 16 and 17, €15 for each of the other items and €20 per drawing, during public opening hours for a period of four weeks commencing on 19th October at:

    Railway Procurement Agency,
    Parkgate Street,
    Dublin 8.


    Metro North Scheme Traffic Management Plan

    In order to mitigate the effects of the construction of Metro North a Scheme Traffic Management Plan (STMP) has been developed. The STMP is based on RPA’s Metro North Reference Design and an estimate of the timescales it will take to construct Metro North. The overarching goal of the STMP is to minimise the impact of the construction of Metro North on road users and to maintain access to businesses and other premises, whilst keeping traffic (including vulnerable road users) moving safely.


    Appendix A
  • Metro North STMP Appendix A.pdf(1.61MB)

  • Appendix B
  • Metro North STMP Appendix B.pdf(1.82MB)

  • Appendix C
  • Metro North STMP Appendix C Part 1.pdf(2.02MB)
  • Metro North STMP Appendix C Part 2.pdf(2.69MB)

  • Appendix D
  • Metro North STMP Appendix D Part 1.pdf(0.19MB)
  • Metro North STMP Appendix D Part 2.pdf(2.43MB)
  • Metro North STMP Appendix D Part 3.pdf(2.31MB)
  • Metro North STMP Appendix D Part 4.pdf(2.31MB)
  • Metro North STMP Appendix D Part 5.pdf(1.63MB)
  • Metro North STMP Appendix D Part 6.pdf(1.86MB)
  • Metro North STMP Appendix D Part 7.pdf(1.86MB)
  • Metro North STMP Appendix D Part 8.pdf(1.86MB)
  • Metro North STMP Appendix D Part 9.pdf(1.86MB)
  • Metro North STMP Appendix D Part 10.pdf(1.65MB)
  • Metro North STMP Appendix D Part 11.pdf(0.62MB)
  • Metro North STMP Appendix D Part 12.pdf(0.59MB)

  • Appendix E
  • Metro North STMP Appendix E Part 1.pdf(0.26MB)
  • Metro North STMP Appendix E Part 2.pdf(0.35MB)
  • Metro North STMP Appendix E Part 3.pdf(0.27MB)
  • Metro North STMP Appendix E Part 4.pdf(0.43MB)
  • Metro North STMP Appendix E Part 5.pdf(0.28MB)
  • Metro North STMP Appendix E Part 6.pdf(0.52MB)
  • Metro North STMP Appendix E Part 7.pdf(0.45MB)
  • Metro North STMP Appendix E Part 8.pdf(0.35MB)
  • Metro North STMP Appendix E Part 9.pdf(0.55MB)
  • Metro North STMP Appendix E Part 10.pdf(0.51MB)
  • Metro North STMP Appendix E Part 11.pdf(0.61MB)
  • Metro North STMP Appendix E Part 12.pdf(0.42MB)
  • Metro North STMP Appendix E Part 13.pdf(0.28MB)
  • Metro North STMP Appendix E Part 14.pdf(0.46MB)
  • Metro North STMP Appendix E Part 15.pdf(0.31MB)
  • Metro North STMP Appendix E Part 16.pdf(0.57MB)
  • Metro North STMP Appendix E Part 17.pdf(0.35MB)
  • Metro North STMP Appendix E Part 18.pdf(0.19MB)
  • Metro North STMP Appendix E Part 19.pdf(0.61MB)
  • Metro North STMP Appendix E Part 20.pdf(0.55MB)
  • Metro North STMP Appendix E Part 21.pdf(0.49MB)
  • Metro North STMP Appendix E Part 22.pdf(0.44MB)
  • Metro North STMP Appendix E Part 23.pdf(0.42MB)
  • Metro North STMP Appendix E Part 24.pdf(0.53MB)
  • Metro North STMP Appendix E Part 25.pdf(0.59MB)
  • Metro North STMP Appendix E Part 26.pdf(0.41MB)
  • Metro North STMP Appendix E Part 27.pdf(0.59MB)
  • Metro North STMP Appendix E Part 28.pdf(0.71MB)
  • Metro North STMP Appendix E Part 29.pdf(0.13MB)
  • Metro North STMP Appendix E Part 30.pdf(0.26MB)
  • Metro North STMP Appendix E Part 31.pdf(0.62MB)
  • Metro North STMP Appendix E Part 32.pdf(0.33MB)
  • Metro North STMP Appendix E Part 33.pdf(0.33MB)
  • Metro North STMP Appendix E Part 34.pdf(0.43MB)
  • Metro North STMP Appendix E Part 35 .pdf(0.38MB)
  • Metro North STMP Appendix E Part 36.pdf(0.33MB)
  • Metro North STMP Appendix E Part 37.pdf(0.44MB)
  • Metro North STMP Appendix E Part 38.pdf(0.31MB)
  • Metro North STMP Appendix E Part 39.pdf(0.29MB)
  • Metro North STMP Appendix E Part 40.pdf(0.29MB)
  • Metro North STMP Appendix E Part 41.pdf(0.41MB)
  • Metro North STMP Appendix E Part 42.pdf(1.42MB)
  • Metro North STMP Appendix E Part 43.pdf(0.44MB)
  • Metro North STMP Appendix E Part 44.pdf(0.49MB)
  • Metro North STMP Appendix E Part 45.pdf(0.43MB)
  • Metro North STMP Appendix E Part 46.pdf(0.43MB)
  • Metro North STMP Appendix E Part 47.pdf(0.62MB)
  • Metro North STMP Appendix E Part 48.pdf(0.61MB)
  • Metro North STMP Appendix E Part 49.pdf(0.61MB)

  • Appendix F
  • Metro North STMP Appendix F Part 1.pdf(3.29MB)
  • Metro North STMP Appendix F Part 2.pdf(4.12MB)
  • Metro North STMP Appendix F Part 3.pdf(2.88MB)
  • Metro North STMP Appendix F Part 4.pdf(2.88MB)
  • Metro North STMP Appendix F Part 5.pdf(2.34MB)
  • Metro North STMP Appendix F Part 6.pdf(3.54MB)
  • Metro North STMP Appendix F Part 7.pdf(2.69MB)

  • Appendix G
  • Metro North STMP Appendix G Part 1.pdf(3.51MB)
  • Metro North STMP Appendix G Part 2.pdf(3.18MB)
  • Metro North STMP Appendix G Part 3.pdf(3.21MB)

  • Appendix H
  • Metro North STMP Appendix H Part 1.pdf(2.31MB)
  • Metro North STMP Appendix H Part 2.pdf(2.86MB)
  • Metro North STMP Appendix H Part 3.pdf(2.85MB)
  • Metro North STMP Appendix H Part 4.pdf(2.81MB)

  • Appendix I
  • Metro North STMP Appendix I Part 1.pdf(2.34MB)
  • Metro North STMP Appendix I Part 2.pdf(2.47MB)
  • Metro North STMP Appendix I Part 3.pdf(2.64MB)

  • Appendix J
  • Metro North STMP Appendix J.pdf(1.84MB)
  • Metro North STMP Appendix K Part 1.pdf(3.96MB)

  • Appendix K
  • Metro North STMP Appendix K Part 2.pdf(4.93MB)
  • Metro North STMP Appendix K Part 3.pdf(3.44MB)

  • Appendix L
  • Metro North STMP Appendix L.pdf(1.51MB)

  • Appendix M
  • Metro North STMP Appendix M Part 1.pdf(2.54MB)
  • Metro North STMP Appendix M Part 2.pdf(2.45MB)
  • Metro North STMP Appendix M Part 3.pdf(1.03MB)

  • Appendix N
  • Metro North STMP Appendix N.pdf(0.19MB)

  • Appendix O
  • Metro North STMP Appendix O.pdf(5.63MB)

  • Appendix P
  • Metro North STMP Appendix P.pdf(0.58MB)

  • Appendix Q
  • Metro North STMP Appendix Q.pdf(0.22MB)
  • Structure of the Railway Order Application Documents

    The Railway Order Application for Metro North is accompanied by the following documents:
    Draft Railway Order
    Return to Top

    Environmental Impact Statement (EIS) and Environmental Impact Statement Non - Technical Summary (NTS)

    For ease of local identification this Environmental Impact Statement (EIS) has been divided into seven areas. These areas are numbered Area MN101 to Area MN107 inclusive going from Belinstown in North County Dublin to St. Stephen’s Green in the city centre:

    MN101: Belinstown to Swords Stop
    MN102: Swords Stop to Airport North Portal
    MN103: Dublin Airport
    MN104: Dublin Airport South Portal to Santry Avenue
    MN105: Santry Avenue to Albert College Park
    MN106: Albert College Park to Mater Stop
    MN107: Mater Stop to St. Stephen’s Green

    Click here for more information on the Structure of the Environmental Impact Statement (Structure of the Environmental Impact Statement.pdf) (0.02MB)
    Return to Top

    Books of Reference
    Return to Top

    Plan of Proposed Railway Works

    The plan of the railway works referred to in the Order is made up of 3 sets of drawings; Alignment Details, Structures Details and Property Details. Each of these is divided by area into Fingal County Council District (Belinstown to Santry Avenue) and Dublin City Council Distinct (Santry Avenue to St. Stephen’s Green).

    Alignment Details:

    Structures Details:

    Return to Top

    Property Details:

    Metro North Railway Order Application Newspaper Notice
    Return to Top

    Inspection of the Railway Order and Accompanying Documents

    A copy of the Draft Railway Order and each document accompanying the application may be inspected during normal office or opening hours from the 17th of September 2008 for the duration of 6 weeks until the 29th of October 2008, as set out by the Newspaper Notice, at: A copy of the Draft Railway Order and each document accompanying the application can also be downloaded from this web-page. Simply click on any of the links and follow the instructions.

    Return to Top

    Written Submissions

    An Bord Pleanála will consider any submissions in relation to the proposed Railway Order or in relation to the likely effects on the environment of the proposed railway works which are submitted in writing to it by any person in accordance with their terms and conditions. These terms are set out in the Metro North Railway Order Application Newspaper Notice and are available from An Bord Pleanála directly.

    Return to Top

    Oral Hearing

    An Bord Pleanála may at its absolute discretion hold an oral hearing into the application for a Railway Order.

    Return to Top

    Purchase of Documents

    A copy of the Draft Railway Order and each document accompanying the application can be downloaded free of charge from this web-page. Simply click on any of the links above and follow the instructions.

    Copies or extracts from the documents, including the Environmental Impact Statement and the Non-Technical Summary of the same, may be purchased on payment of a fee not exceeding the reasonable cost of making such copy or extract from Railway Procurement Agency, Parkgate Street, Dublin 8.

    Environmental Impact Statement (All Volumes including NTS)€170.00
    Environmental Impact Statement Non-Technical Summary €5.00
    Environmental Impact Statement (Volume 1)€30.00
    Environmental Impact Statement (Volume 2 - Individual Books)€15.00
    Environmental Impact Statement (Volume 3 - Individual Books)€15.00
    Plan of Proposed Railway Works (Single Drawing)€20.00

    Costs for other copies or extracts from the documents are available on application.

    Return to Top